Welded Steel Pipe (API 5L X42 X52)
Home >-
API steel pipe
- API steel pipe
- API steel casing pipe
- Casing and Tubing
- API drill pipe
- API5L steel pipe
- Oil pipeline
-
Carbon steel pipe
- Carbon steel pipe
- Welded steel Pipe
- seamless carbon steel pipe
- Petroleum Casing Pipe
- interpret seamless steel pipe
- Water pipeline - Handling and
- Applications of welded pipe pil
- welded steel pipes and Seamless
- ASTM A 106 Seamless Pipe
- Carbon dioxide resistant oil ca
- seamless steel pipe On-line col
- EN 10305-1 / DIN 2391 cold draw
- EN 10255 Standard Pipe,replaces
- API 5L A53 / A106 Grade B, Seam
One of the Top 500 enterprises in China foreign trade
QCCO was approved as a member of “China Association for Contracting Projects Abroad “and granted a membership certificate on Sep 28,2005; “Credibility Rating AAA certificate in Foreign Trade” was granted to QCCO by China Shippers’ Association
Product Description
Welded Steel Pipe API 5L GR B
Welded Steel Pipe API 5L X42
Welded Steel Pipe API 5L X52
Welded Steel Pipe API 5L X45
1. OD: 1/ 8"-48", 10mm-1219mm
2. Thickness: SCH10-SCH160 XXS, 1.24mm-60mm
3. Length: 5-12m, fixed or unfixed length, or as customer's requirement.
4. Standard: BS, EN, JIS, ASTM, GB, DIN, API 5L/ 5CT
5. Material: A106, A53, A179, A192, GR. A/ B/ C, E235/ E355/ E315/ E275, ST35/ 37/ 45/ 52,
Q195/ Q235/ Q345, 10#/ 20#/ 16MN, STPG370/ STS370/ STPT370,
STKM11A/ STKM12/ STKM13/ STKM14, (A, B, C)
X42/ X52/ X56/ X80 Casing Pipe |
6. Surface: Black painting(or red ), polished white, hot dipped zinc galvanizing, 3PE, 2PE, 1PE.
7. Process Method: Hot rolled, cold rolled, cold drawn, hot finish
8. Usage: Oil, construction, buildng, structure, transport.
9: Delivery Time: 10-30 days
10: Payment, T/ T, L/ C, Negotiable Oil pipeline |
上一篇:ERW API 5CT N80 steel pipe,ERW API 5CT N80 steel tube
下一篇:API 5L Seamless Carbon Steel Pipe for Structure or Oil Field