API5L X52 Pipeline/Spiral Submerged Arc Welded Steel Pipes
Home >-
API steel pipe
- API steel pipe
- API steel casing pipe
- Casing and Tubing
- API drill pipe
- API5L steel pipe
- Oil pipeline
-
Carbon steel pipe
- Carbon steel pipe
- Welded steel Pipe
- seamless carbon steel pipe
- Petroleum Casing Pipe
- interpret seamless steel pipe
- Water pipeline - Handling and
- Applications of welded pipe pil
- welded steel pipes and Seamless
- ASTM A 106 Seamless Pipe
- Carbon dioxide resistant oil ca
- seamless steel pipe On-line col
- EN 10305-1 / DIN 2391 cold draw
- EN 10255 Standard Pipe,replaces
- API 5L A53 / A106 Grade B, Seam
One of the Top 500 enterprises in China foreign trade
QCCO was approved as a member of “China Association for Contracting Projects Abroad “and granted a membership certificate on Sep 28,2005; “Credibility Rating AAA certificate in Foreign Trade” was granted to QCCO by China Shippers’ Association
API5L X52 Pipeline/Spiral Submerged Arc Welded Steel Pipes
Spiral Welded Steel Pipe
O.D.:711/630/529/478;W.T.:12.7mm;Length:5.8~12m
Standard/Material:API5L Gr.B/X42/X52/X56/X60
spiral double-side submerged arc weled steel pipe
Production |
SSAW Welded Steel Pipe |
|
|
Standard |
ASTMA139,ASTMA252, API 5L, DIN, EN10217/10219/10224,BS,JIS |
Out Diameter |
219mm-3048mm |
Wall Thickness |
6mm-25mm |
Grade |
ASTMA53 Gr.B;API5L Gr.B,X42~X70; ASTMA252 Gr.2,Gr.3; ST37,ST42,ST52;EN10025 S235JR,S275JR,S355JR etc. |
Length |
5.8-18m,or as customer’s requirements. |
Place of Origin |
China |
Market |
Middle East,Europe,South-east Asia,USA,Canada,South America. |
Technique |
SAW welding |
Usage |
1. Piling project 2. heat-supply project 3. conveying water,coal gas,drainage and other Low and middle pressure fluids 4. API5L Petroleunm and natural gas pipeline 5. Chemistry industry 6. Electric power plant circulating pipe |
Package |
1.Bundle packing or in bulk, 2. Bevelled or plain ends as per buyer's request, 3. Marks: as per customer's request, 4. Surface treatment:with or without varnish/2PP/2PE/3PE/3PP coating, 5. Plastic protecting caps at ends. |
Delivery Time |
about 20days after receipt of irrevocable L/C at sight or 30% deposite |
All our products |
1. seamless steel pipe 2. ERW steel pipe 3. casing pipe 4. oil tube 5. hot-rolled steel pipe 6. spiral steel pipe 7. hot-galvanized steel pipe |
ERW steel pipe|
Alloy steel pipe|
spiral steel pipe|