Shipping instructions on the steel pipe P11
Production quality control process, from the steel mill, the beginning of the purchase of spare parts, Tsai serious test for each production and processing of links to the debug build, and every plant of the steel pipe should have a two-day test on-site records check. Check the data show that the vast Shun steel pipes in accordance with ISO9001 quality control system performance of various procedures, some aspects of purchasing, Dan, always check the original contract of purchase of the plant, especially in the advanced U.S. Lincoln welder company, the end of the pipe automatic chamfering with a flat head machines, X-ray detection machine, the television industry, ultrasonic flaw detector, hydrostatic pressure during the test machine, universal testing machine, chemical composition analyzer and other equipment and professional support staff operations, has a sound detection equipment and advanced management mode to ensure the quality of each steel pipe . Strict adherence to API Spec5L, GB/T9711.1-1997, GB/T9711.2-1999, SY/T5037-2000, GB/T8162-2008, GB / T8163-2008, GB3087-2008, ASTM A106, ASTM A53 standard. Has passed the ISO9001-2000 international quality management system certification, environmental management system certification of occupational health and safety management system certification, the People's Republic of China special equipment manufacture license and the American Petroleum Institute standards, and Hebei Province boiler and pressure vessel surveillance and inspection. Procurement for confirmation, to distinguish it from the behavior of seamless steel pipes manufacturers currently on the market, most of the fraud industry, have become important building materials directly related to the construction of the heart was normal.
、
The total weight of the delivery by March 2010 355,6 * 15,09 P11 steel pipes from 65.435 tons
A few meters to 492 meters, 457.2 19.05 * weight 3.14 t m to 13.9 m
Clarifications to the company are as follows:
Your company is one, and I 355.6 * 15.09 steel pipe order is 470 meters, 59.554 tons, the capacity
The theoretical weight of steel pipe, it can not provide the calculation of weight. In addition, 457.2 * 19.05 steel pipes
Order of 10 m, the theoretical weight of 2.055 tons.
Due to the nature and significance of steel pipes P11, steel mill allows only positive tolerance negative tolerance, so that
Per square meter of its actual weight is greater than the theoretical weight to the extent permitted tolerances in accordance with standard steel pipe a positive 12.5%,
The correspondent of the weight can be 12.5%, which means that 59.554 tons of the theoretical weight of steel pipe is actually
Weight ranging from 59.554 to 66.998 tons
3 companies and have contractual requirements to ensure the delivery of several meters, and then became so may allow a 10% payment
The goods, which means that we order 470 m, the steel can be delivered to 517 meters, I should unconditionally accept only
Can the contract, or take steel may be plus or minus 5% of the supply, given the nature of deficits P11 steel pipes,
In order to avoid the use of your company is 10% of the time difference between the amount of the reasons why I chose to deliver
(4) steel pipe 457.2 * 19.05 produced a few meters up to 6-7 meters with low m contract, so that the cross
Items 2, the number is 13.9 m, 3.14 tons.
(5) Thus, the company has set the amount is reasonable in the box, please check.