304/316L ASTM Welded Stainless Steel Pipe
Home >-
API steel pipe
- API steel pipe
- API steel casing pipe
- Casing and Tubing
- API drill pipe
- API5L steel pipe
- Oil pipeline
-
Carbon steel pipe
- Carbon steel pipe
- Welded steel Pipe
- seamless carbon steel pipe
- Petroleum Casing Pipe
- interpret seamless steel pipe
- Water pipeline - Handling and
- Applications of welded pipe pil
- welded steel pipes and Seamless
- ASTM A 106 Seamless Pipe
- Carbon dioxide resistant oil ca
- seamless steel pipe On-line col
- EN 10305-1 / DIN 2391 cold draw
- EN 10255 Standard Pipe,replaces
- API 5L A53 / A106 Grade B, Seam
One of the Top 500 enterprises in China foreign trade
QCCO was approved as a member of “China Association for Contracting Projects Abroad “and granted a membership certificate on Sep 28,2005; “Credibility Rating AAA certificate in Foreign Trade” was granted to QCCO by China Shippers’ Association
Specifications
1)Commodity:Stainless Steel Welded Pipe
2))Material: 304,316L,304L,316,321,310S,etc Stainless steel pipe |
API steel pipe|
3)Thickness: 0.5mm-20mm
4)Length: 1m-12m
Seamless steel pipe|
Stainless Steel Welded Pipe | |
Material Grade | 304,304L,316 ,316L,321,310S and so on |
Steel pipe |Standard | ASTM A312, A554, A249, A269 and A270.ect |
DIN 17456-85 , DIN 17458-85, DIN 17459-92.ect | |
JIS G3446-1994, JIS G3448-1997, JIS G3459-1997, JIS G3463-1994,ect. | |
GB13296-1991, GB14975-2002, GB14976-2002,ect. | |
Outer Diameter | 13.7-2000mm |
Thickness | 0.5-20mm |
Length | Carbon steel pipe| 1m -12m or as customers' request |
Polish | 180G, 320G, 400G Satin / Hairline |
400G, 500G, 600G or 800G Mirror finish | |
Test | eddy current inspection, ultrasonic inspection, X-ray inspection, real-time imaging, hydrostatic test, spectral analysis, intergranular corrosion, water pressure test, and mechanical property testing facilities. |
Payment | 1) by L/C at sight, |
API5L steel pipe 2) 30% deposit, 70% balance before Shipping. | |
Delivery time | A.7 days if this goods is stock goods. |
B.30 days if this goods will be produced after order | |
Validity | Valid time is 3 days for price usually. |
Carbon steel pipe | |
ERW steel pipe| MOQ |
1 ton |
Capacity | 1000 ton per month |
Certificate | ISO, SGS, and third part inspection |
Applications | Alloy steel pipe| spiral steel pipe| the products are widely used in chemical industry, condenser pipe, heat exchanger, petroleum, shipping military, environment protection, high temperature resistant, low temperature resistant, corrosion resistant and so on. |